Day 4: another really hot work day. Double waterfall construction is almost complete
Day 4: another really hot work day. Double waterfall construction is almost complete
Top of falls are finished and yard clean up. Waiting of pumps and filters etc to arrive tuesday. Then final assembly and landscaping.
hooking up savio skimmer to the old sequence 3600 pump and uv to waterfalls. Once bio filter and performance pro pump arrive, they will pull from bottom drain up to the falls for a lot more water flow
Result from this little pump is pretty impressive
time to clean out the work water and power wash it getting ready for the fresh water
Nice work ma4utopia. Got to be honest...I was struggling to work out the scale from your recent pix, but seeing someone in it, it looks great and well worth the effort
Fall/s look great too.
Pavers being moved away and repositioned.
Last edited by ma4utopia; 07-26-2020 at 01:36 PM.
the savio skimmer will get a rock cover to camouflage it.
Can't wait to see some plants around the pond rock edges
A small concrete curb high enough to retain the rock and dirt would be nice, the rain will have a muddy mess on your pavers. It's lookin good man..
on the right side.. drains towards the pond . Protected by a 5 inch tall rock border >liner>rocks >pond no water will drain into the pond
On left side the pavers on the pool side angle towards the pool but the pool has a angle towards the pond. Those 2 angles meet in the middle and drain towards the white fence. I'll have no drainage issues. Never did.
Hey ma4utopia, coming along nicely...
What's this space here? I recall at the start of this thread you said you had no space. Was this not usable for an RDF or sieve?
Have the pump and bead filter squeezed against a fence next to my pool equipment. Just enough room to get in and service all. Skimmer filter pump is to the left of this with the uv
Last edited by ma4utopia; 07-28-2020 at 06:42 PM.