Okay this is for all you smarties out there. If one is to consider using a 4 inch compression union for a repair in the pipework for a bottom drain, would that produce any problems? I have hit a wall during the installation of the bottom drains and the pipework is at a high incline. We are thinking about cutting the pipe out and using a compression union to connect the new pipework to the pipe thats coming out of the bottom drain.Why are we in this situation you ask? Well I think it's because of the angle that we were putting the pipe in. When we put the bottom drain in, we had a 4 inch pipe connected to it. We did not realize how hard it was going to be connecting the pipe together until we were down there doing it. In my personal opinion, I think that we should have had all the pipework connected together before cementing in the bottom drain. We would not be in this situation that we are in. What should I do? Is this new idea a good approach or should we consider ripping the whole bottom drain out and buying a new one and starting over? This has got me so down. I really need some help. That **** abs cement set's really fast!http://www.sprinklerwarehouse.com/Ki...p/cpc-4000.htm



Reply With Quote








